ARTIFICIAL INTELLIGENCE AND NON-DESTRUCTIVE TESTING

Leave us your information to download the dossier.

  • * Required field

    The responsible party for data processing is TECNATOM, S.A. who will process it to subsequently respond to your enquiry.

    In order to address your enquiry, we may send your data to other entities within the TECNATOM Group. TECNATOM service providers may also have access to your data.

    You have the right to access, correct and remove your data, as well as other rights which are explained in detail in our Privacy Policy.

    By clicking on the “Send” button you declare to be aware of and accept our Privacy Policy.

  • This field is for validation purposes and should be left unchanged.
Saturday, July 31, 2021
Home Nuclear

Nuclear

TecOS PROCEED: Digitalize your field operations by means of dynamic instructions

Work management processes in the operation and maintenance of power generation assets constitute one of the fields with the greatest potential for growth at a time when digital transformation is revealed as the way...

Upgrading French 1300 nuclear power plants

An enormous challenge, a complex project, an international multidisciplinary team, French as the only language and numerous interventions at different French plants… Susana López is in charge of the upgrade of simulators for the...

Almaraz now has its full-scope simulator on its own premises

The full-scope simulator for Almaraz nuclear power plant began its operations at the  Tecnatom facilities on November 1st 1998. It was started up with the dual objective of providing training for the operators, with...

Tecnatom collaborates with the IAEA in the Human Factors Area

Human Factors Engineering Aspects of Instrumentation and Control System Design INTRODUCTION The International Atomic Energy Agency (IAEA) has published an Energy Series document entitled “Human Factors Engineering Aspects of Instrumentation and Control System Design” (NR-T-2.12). The document...

Long-term operation of nuclear power plants: the importance of the reactor vessel

Nuclear power plants are designed to operate for a nominal design period of some 40 years, which may be extended in response to a favourable technical assessment by the regulatory authority of each individual...
formacion tecnatom

Tecnatom will carry out training and inspection up to the decommissioning of the Spanish...

The companies ANAV and CNAT, the operators of the Ascó-Vandellós II and Almaraz-Trillo nuclear power plants respectively, have selected Tecnatom to undertake training, inspection and testing services from now until the end of the...
EQUILIBRADO HVAC

The importance of balancing HVAC systems

What are HVAC systems? HVAC (Heating, Ventilation and Air Conditioning) systems are designed with a dual purpose: on the one hand they filter particles from the air in a given enclosed area and, on the...
atomos

Supporting the development of nuclear fusion

Have you heard of ITER? ITER is undoubtedly one of the most ambitious projects ever undertaken by mankind, not only because it constitutes a challenge in terms of complexity and cost, but also because it...
monitorizacion-de-la-velocidad

Take a look at the latest type of remote visual inspection

Visual inspection consists of observing the external or accessible surfaces of parts, components or materials, either with the naked eye or using optical instruments. It is the Non-Destructive Testing (NDT) technique par excellence and...
vasija nuclear

Predicting reactor vessel degradation in long-term operation: NOMAD

As of 2020 there are more than 100 nuclear power plants in the world whose reactors have been in operation for more than 40 years. It is now necessary to check that the vessel...

Archive:

  • 2018
  • 2019